Skip to content
Selected projects

Recent installations across banks, embassies, and luxury residences.

Embassy Commissions · Accra, Ghana

European Embassy Reception Mosaic — Cantonments, Accra

European embassy commission requiring bespoke mosaic flooring for ambassadorial reception hall plus marble surround. Floor Experts Ghana sourced provenance-matched stone, hand-fabricated traditional mosaic pattern, coordinated installation against diplomatic-protocol installation window.

Heritage Restoration · Cape Coast, Ghana

Heritage Residence Floor Restoration — Cape Coast Castle Quarter

Historic residence restoration commission requiring careful methodology against original 19th-century stone-and-hardwood floor specification. Floor Experts Ghana sourced provenance-matched stone from heritage quarry continuity, restored original hand-laid herringbone parquet, delivered methodology-documented restoration.

Premium Hotels · Accra, Ghana

Premium Hotel Lobby Floor — Airport City, Accra

Premium hotel lobby commission requiring 1100 sqm bookmatched marble flooring with custom mosaic central medallion at reception. Floor Experts Ghana delivered slab-block coordination, hand-honed edge profiling, and mosaic-pattern hand-laying against active hospitality calendar.

High-Class Residential · Accra, Ghana

Premium Residential Package — Trasacco Valley

Premium-residential commission requiring full luxury floor package across kitchen porcelain, master-suite walnut hardwood, formal reception marble, family-room travertine. Floor Experts Ghana coordinated multi-material specification, single-project-office discipline, architect-coordinated phasing across active-residence handover schedule.

Tier-1 Banking · Accra, Ghana

Tier-1 Bank Executive Boardroom — Ridge District, Accra

Tier-1 bank executive boardroom commission requiring 280 sqm specification-grade walnut hardwood across the full boardroom plus directors' reception corridor. Floor Experts Ghana coordinated hardwood-grade selection from NWFA NOFMA Premier grade, hand-honed edge profiling, and architect-coordinated installation against an active banking-floor schedule.